Due to previous poor workmanship by others, this property underwent a complete exterior stucco replacement, with new installations throughout and a stone veneer accent on the front. This comprehensive update not only corrects past issues but also significantly enhances the building's curb appeal and structural integrity.

The deficiencies of the existing EIFS system, with the moisture behind the stucco, ended up rotting the plywood and causing a water leak inside the home
After the removal of the entire EIFS system, we saw that there was no moisture barrier applied on the plywood
The existing insulation was only 1 inch in thickness
The insulation was only mechanically fastened onto the plywood substrate
New plywood installation with proper moisture barrier
Full EIFS system with drainage
Consistent finish texture all around
Higher curb appeal with the added stone veneer on the front elevation
No subcontracting — every stage below was carried out by our certified installers, start to finish.
Installation of WRB ( water resistive barrier)
Installation of 2 inch PUCCS Insulation boards with drainage
Application of 5 oz. reinforcing mesh embedded in basecoat cement
Installation of simple flat mouldings
Application of textured finish coat
The home was in the construction phase with exterior sheathing already installed and prepared for the exterior cladding system. We had to a lot of corrections on the exterior sheathing.
A 3-foot gap between the house and the fence line limited scaffolding options on the east elevation, requiring a staged ladder-and-platform approach
Work had to be carefully sequenced around framing completion, window installation timing, and coordination with other trades working on the building envelope to ensure proper integration of the stucco system.
Initially a plan for the repair ended up being a full replacement. After coming to realize the stucco was done improperly with the wrong materials with many defects, the homeowner decided to replace the entire system with the proper EIFS, and also increase the curb appeal by adding stone veneer.
Before we do any vapour barrier or EIFS related work, we make sure that your house walls are in a solid condition. If there's a damage area on the plywood, we certainly will replace them first.
All doors and windows need to be installed before the the stucco goes up.
Most definitely. Combining modern EIFS with stone veneer will add a rich texture and create a high-end curb appeal.